1:00 PM - 2:00 PM
Senior Product Manager Interview
Sarah Jenkins

Location
onsite, Tadpatri, AP, India
Salary
$7k – $13k/yr
Commitment
Full Time
Level
Senior (5+ years)
To maintain the Instrumentation and control systems of Boiler, Turbine and Generator sets of TPP/DG to run power plant and to ensure smooth and trouble free operation of the power plant in order to produce uninterrupted power supply.
Andhra Pradesh Cement Works (APCW): a unit of UltraTech Cement Limited, a flagship company of the Aditya Birla Group is situated at Tadipatri, District - Anantapur. APCW has 2 Lines. Line-1 was commissioned in 1998 with an installed capacity of 2 million tons (2 MTPA) cement annually, which has been enhanced to 2.7 MTPA over a period of six years through several improvements and modifications. Line-2 was commissioned in August 2008 with an installed capacity of 3.4 MTPA. The total cement production capacity of APCW, along with the associated Units, is 11 MTPA. The integrated plant is associated with two grinding units and one bulk terminal - Arakkonam Grinding Unit (ARCW) in Tamil Nadu, Ginigera Grinding Unit (GICW) in Karnataka and Shankarapalli Bulk Terminal (SBT) in Hyderabad. The unit has also established a thermal power plant of 4 X 25 MW capacity to cater the plant's power requirement. The APCW Mine is located near Tummalapenta Village, Kolimigundla Mandal, Kurnool District at Andhra Pradesh. It has a production capacity of 9.20 MTPA. The mine lease extents up to 844.939 hector. It was opened in the year July 1997. The general geology falls in Narji Limestone formation of Kurnool system, age of 800 Mio years old. As per UNFC classification, mine has got the limestone reserves of 181.65 Mio MT as on 31 March 2012. It is one of the largest mines producing 9.20 Mio MTPA limestone at single location.
Location of the plant posses a challenge to get the skilled manpower and proper responses from some vendors.
KRA1 Plant Availability: Timely Completion & implementation of maintenance activities for maximum availability Instrumentation department of BTG 1 & 2 for achieving targets with respect to downtime, maintenance work and customer satisfaction. Instrumentation Cost Optimization: Plan, monitor and control cost (spares, Inventory & manpower) of Electrical & Instrumentation maintenance activities in BTG 1 & 2 to optimize maintenance cost within the budget.
KRA2 Continuous Improvement: Study and identify projects, coordinate and monitor implementation of up-gradation/modification/de-bottle necking/improvement projects to improve the availability & reduce cost of Electrical & Instrumentation maintenance.
KRA3 SHE (Safety, Health & Environment) along with Sustainability initiatives: Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area. Educating team about “I know my job”, “I know the hazards associated with my job and I applied control measures” & “I escalate to my senior” among manpower deployed in sections/department manpower including peer, WB & CL manpower.
KRA4 System Management: Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards.