1:00 PM - 2:00 PM
Senior Product Manager Interview
Sarah Jenkins
Location
onsite, Burr Ridge, IL, United States
Commitment
Full Time
Level
Middle (2-4 years)
Location: Burr Ridge, IL (Need to be onsite from day 1)
Duration: Long Term
Completing the Key-Cycle Test for every major release build given to Off-Highway Vehicle Product validation team. The Key-Cycle Test is an on-vehicle test that consists of installing hardware and software on a Magnum Tractor and performing 15 individual key-cycles on the vehicle. During each keycycle, the tractor is driven around the test-track and all the system’s functionalities, such as Autoguidance, Tractor App, Coverage Mapping, and ISOBUS, are evaluated. Logs are collected during the entirety of the test and any defects that are found are documented and reported. These 15 key-cycle tests is completed once on each of the following 6 PCM variants: (PCM stands for processing and control module; it is the tractor’s on-board computing module).
Results are recorded in an excel doc and analysed after the test is completed.
Completing the KPI (Key Performance Indicator) Test for every major release build given to PS&T PV. The KPI Test is an on-vehicle test that consists of installing hardware and software on a Magnum Tractor and timing how long different menus and features take to load. Each feature’s loading time is measured three times. Logs are collected during the entirety of the test and any defects that are found are documented and reported. This test is completed once on each of the following 6 PCM variants:
Results are recorded in an excel doc and analyzed after the test is completed.